Mobile form system walks through tunnel via jacks and hydraulic powered double drum winch
Client: Kiewit - Devil's Slide Project
Manufacturer: Kiewit Underground District Shop
Complete plan and custom fixture design for transporting and erecting 22' diameter tunnel form system
Client: Dragados/Judlau - East Side Access
Complete material handling system for installation of cross passage form system in elevated cross passages
Client: Dragados/Judlau - East Side Access
Manufactured by: American Commercial & Nebraska Welding
Design of bulkhead system for MCT form carrier
Client: Dragados/Judlau - East Side Access
Manufactured: Nebraska Welding
Detailed design of temporary support system over existing openings. Capacity = approximately 250 tons
Client: Dragados/Judlau - East Side Access
Manufactured: Nebraska Welding
Trolley beam, hoists and rigging systems for transferring forms from upper level tunnels to lower level and from east to west
Client: Dragados/Judlau - East Side Access
Manufactured: Nebraska Welding
System for handling and disassembling cavern forms
Client: Dragados/Judlau - East Side Access
Manufactured: Schiavone Shop
Form system design for bulkheads of cavern forms
Client: Dragados/Judlau CMO 19
Manufactured: Job Built
Conceptual design and proposal for concrete form system
Client: Barnard
Formwork gantry conceptual design
Client: Harsco
Proposal for 32' diameter shaft form system
Client: Drill Tech
Spillway Step Form System Conceptual Design
Client: Kiewit - Folsom Phase IV
Design of low profile system for transporting a 90 ton form system into a tunnel
Client: JF Shea
Preliminary design & proposal for blast wall forming system
Client: Drill Tech
Conceptual design of system for lowering pipes down shaft
Client: Barnard
Detailed design and component fabrication for new mortar liner system to rehabilitate small diameter pipes
Client: Kiewit