In March 2023, Rubidoux High School held a grand opening ceremony to celebrate the completion of its new Elliott N. Duchon Concert Hall. This 14,000 square foot facility includes a 300+ seat concert venue, a music classroom, and an outdoor amphitheatre to support the various music programs at the site, including band, choir, and orchestra. This project was made possible thanks to 2014 Measure EE funding the design costs for the project, and providing a local match required to qualify for state matching funds that funded a large majority of the project, with exception to a small portion that was funded using local developer fees. The Elliott N. Duchon Concert Hall is a beautiful building the district feels so proud to bring to Rubidoux students and the community.