Established to facilitate on-campus survey experiences (GNSS, Total Station, LiDAR, UAS, etc.) where positions could be evaluated against known values.
Sites selected to maximize accessibility, visible sky, student safety and mark stability.
Some sites damaged by 2024 steam tunnel construction (North end of quad).
Considering expansion to Cadet Field and Bartz Field in 2025.
All data files are available via a zip file on a google drive.
A KMZ visualization of all points
Summary sheets of control point coordinates
OPUS project files for each point
Pre-Adjustment Trimble files for each point
Photos of all marks (both local and regional setting)