Rates and accepted materials are subject to change without notice. For questions, please call (330) 488-6161 for Stark or (330) 753-9019 for Summit
Hours: 7:00 AM - 4:30 PM
Rates:Ā
C & D: $13.00/yd (Disposal Rate)
Shingles: 13/yd
Minimum Load: $120.00Ā
Telephone Poles: $15.00
Fuel Surcharge: $10 per ticket fuel surcharge
1947 WADSWORTH RD, NORTON, OHIOĀ 44203
_______________________________________________________________
Hours: 7:00 AM - 5:00 PM
Rates:Ā
C & D Total Cubic Yard Rate: $12.00/yd
Per Yard: $11.20 (Disposal Rate)
Tip Tax: $0.80 per yard
Hard Fill: $11.00/yd
Crushed Concrete: $15.00/ ton
Sandstone: $50/ton
Minimum Load: $120.00 plus health department tip tax
Telephone Poles: $12.00 plus health department tip tax
7280 LISBON STREET, EAST CANTON, OHIOĀ 44730Ā
_______________________________________________________________
*IF A MATTRESS OR TIRE IS FOUND IN A LOAD THERE WILL BE AN ADDITIONAL CHARGE*
LUMBER & FRAMING
FURNACEĀ
ASPHALT
SIDING & ROOFING
BRICK
DIRT
WINDOWS & DOORS
WIRING & INSULATION
SPOUTING & PLUMBING FIXTURES
CONCRETE
HAZARDOUS WASTE
BARRELS
CLOTHES
SOLID WASTE (GARBAGE)
BATTERIES
RUGS
RUBBER/PLASTIC HOSE
APPLIANCES
DRUMS/BARRELS
PAPER WASTE
FURNITURE
ASBESTOS
TIRES*
MATTRESS'S OR BED SPRINGS*
*IF A MATTRESS OR TIRE IS FOUND IN A LOAD THERE WILL BE AN ADDITIONAL CHARGE*
77 N. TO 224 W. TO BARBERTON, EXIT AT BARBER RD. GO NORTH ON BARBER (LEFT) FOLLOW UNTIL STOP SIGN,TURN RIGHT ON WADSWORTH RD. 1/2 MILE ON LEFT HAND SIDE.
77 S. TO RT 30 E. FOLLOW FT 30 INTO EAST CANTON,STRAIGHT ON RT 172 PASS RT 44. 1 MILE DOWN ON RIGHT HAND SIDE.
Images are not updated to reflect current conditions.