Project Materials

Receiving Water Study, Stantec Consulting Ltd.

The Receiving Water Study was completed during preliminary design to (1) evaluate potential locations for a marine outfall and identified the recommended area, (2) evaluate and made recommendations for the design and performance of the diffuser at the end of the outfall, and (3) model how the treated effluent will mix with the water at the outlet in the Northumberland Strait (presented at the December 2017 Open Houses).

A technical letter was subsequently prepared by Stantec providing supplemental information for the study team, and responding to public questions.

Jan 5 2018 Stantec Response to External Stakeholders regarding RWS.pdf
Stantec_Receiving Water Study_Effluent Treatment Plant Replacement.pdf