Designation:Maintenance EngineerDepartment: Maintenance-III DepartmentDuration:September 2015 to December 2018
Key Responsibilities
Responsible for the complete maintenance activities of the Boilers & their Auxiliaries including preventive & break-down maintenance.
Responsible for conducting Boiler Annual Shutdown.
Planning & organizing manpower, materials & spares for Routine maintenance activities & Annual shutdown of Boiler.
Responsible for generating Purchase Requisitions, and follow-up of the materials from concerned vendors.
Responsible for coordinating all documents related to the boiler area including Annual Shutdown & all other Routine Maintenance Reports and Spare parts lists.
To utilize ERP System (SAP ECC6 Plant Maintenance Module) for creating Maintenance Orders, monitoring inventory level, raising Notice of Requirement and notice of Manufacturing, Budgeting/Costing of maintenance jobs, issuing Job Completion Certificates, issuing Material Requisition Slips, etc.
Maintenance & troubleshooting of Rotary equipment such as Centrifugal Pumps, Reciprocating, and screw Compressors as well as Stationary equipment such as Heat Exchangers, Cooling Towers, and storage tanks.
To ensure all Fire Preventive equipment was maintained and tested to ensure its 100% operation.
Coordination with the Projects Department & responsible for the Modifications for the better performance/availability of the equipment.
Coordinate with contractors for any sort of Modifications in the Utility Area including Boilers, Water Treatment Plants & RO Plants, and Tanks.
To receive all types of work permits including Hot work permits, Crane operation permits, confined space entry permits, electrical energize/de-energize permits, and cold work permits.
Authorized to sign Material requisition slip for issuance of material from the warehouse.
To evaluate and check final measurements for issuance of job completion certificates.
Familiar with international codes & standards like API 610, API 618, API 682 & TEMA.
Worked as a Critical Pipelines (CPL) coordinator in Lube-II Refinery Turnaround 2017.
Completed all the pipeline modification jobs proposed by the Operations and Project Department in accordance with ASME B31.
Carried out all the process pipeline repair/replacement jobs recommended by the inspection team in accordance with ASME B31.
Coordinated with DESCON Engineering Limited personnel for the completion of all jobs.
02) Fuel Refinery Turnaround 2016
Served in the Inspection Team for Pressure Vessels and Reactors in Fuel Refinery Turnaround 2016.
Carried out initial inspection of pressure vessels and reactor.
Pre-cleaning and post-cleaning final inspection of pressure vessels and reactor in accordance with API 510 and ASME Section VIII.
Providing recommendations for maintenance jobs (if required).
Box-up of pressure vessels and reactors after completion of all jobs.
AuVitronics Limited (AVT)
Designation:Trainee EngineerDepartment: Maintenance DepartmentDuration:April 2015 to September 2015
Key Responsibilities
Implementation and monitoring of all mechanical-related works on the floor as per approved drawings and methods and safety rules (HSE).
Estimation, preparation, and assignment of the resources such as manpower, materials, consumables, equipment, tools, etc., required for all mechanical and related works prior to execution.
Designing of the layouts of the existing & under-construction building in the Port Qasim plant.
Make the Preventive Maintenance Schedule of the Port Qasim plant Injection Molding machines, its accessories & other utility equipment such as compressors, boilers, chillers, cooling towers, and AHU Systems.