Clarksburg School Building

Building Renovation Updates-


Recently completed projects:

Driveway potholes were filled and drainage swale has been asphalted.

Escape trails have been cleared and repaired including stairway to town field.

Outside Basketball hoop has been replaced.

In Progress projects:

Posting bid for new boilers.

Plumbing repairs to sinks and toilets.

Purchasing and installing new water heater.

Update lighting in the boiler room.

Securing $500,000 from the State for new roof.

Wish List:

Nurse’s office needs renovating with a sink and cabinets.

New PA system.

Improve security for front entrance.

ADA approved toilet and lift to cafeteria.

Current Renovation Funds:

$5000 donation from the VFW for water heater and plumbing.

$3000 donation from anonymous family for plumbing materials.

$ 200 individual donations.

$ 20 from ballroom dance lessons.

Total recent donations equal $8,220.00.


The Clarksburg School Building Feasibility Study

The Town of Clarksburg is conducting a Feasibility and Schematic design study for improving their school building, funded by the MSBA. The School Building Committee, together with Jones Whitsett Architects, and Brian Laroche, PCA360, the Owners Project Manager, are developing the best option for upgrading the existing school. As of March 2017, the process is well underway, and there is one scheme that has been selected by the School Building Committee. It can be found under Building Plans, Scheme E. This addition and renovation project will be studied further in the next months, in order to bring the most well thought out and cost effective project to Town Meeting review in September, 2017.