Photo Album

Contact Us

MoonBots 2012‎ > ‎

Lunar Surface and Missions

NOTE: IF YOU CLICK ON A PICTURE IT WILL GET BIGGER

Every aspect of the ideas, design, and construction of our incredible lunar surface was a whole team effort. We could not have done it without Best Buy, Home Depot, SMaRT Education and most especially Suboken. 

LANDSCAPE DESIGN

A Multi-Level Monster

We knew that we wanted to really be able to showcase our vision of what the Google Lunar X-Prize could mean to the future of lunar exploration and habitation.

We knew from the outset that our board design idea was ambitious, the missions were ambitions, and that our robot needed to be 100% mechanically sound to make the narrow turns and navigate the narrow passage ways.



August 11, 2011
              
MISSIONS & OBSTACLES

Mission Models - 

Lunar Dismount

Lunar Ridge

Solar Field Array Repair

Fallen Payload Items

Bio-Dome Air Filter Repair

Heritage Artifact Museum

Elements: Water/Ice, Helium-3, Silicon

Alien Rover Contact

Time Limit Meteor Shower

Static Models -

Technology Center

Manufacturing Center

Control Tower
THE GAME

August 15, 2011 - 
Comments