The Sherwood Schools 2016 Capital Bond - At a Glance














Live progress from the new Sherwood high school site.  This photo will be updated every 30 minutes with a new snap shot from a camera on site.  The camera is placed near Haide Rd, looking towards the south end of the site (towards Kruger Rd). 

    Follow me on Twitter:    @SSD_COO




























Bond Updates

New information regarding the bond projects will be added below.


To view all updates specific to the design and construction of the new high school, click here



  • Community Forum - April 16th, 2019
    The Sherwood School District will host our next Community Forum on Tuesday, April 16th, at Laurel Ridge Middle School.  Please see attached flyer for details. 
    Posted Mar 21, 2019, 3:45 PM by Summer Bowman
  • 2018 Deferred Maintenance Posters
    Natalie Pastores, a sophomore at Sherwood High School, recently designed "before and after" posters to document the deferred maintenance work done over the summer of 2018.  Natalie has taken graphic design and was a graphic design CTE apprentice with Ms. Barrett at Sherwood High School.  Natalie's design work was extremely impressive and can be seen below.  Thank you Natalie for helping document this important work as part of the 2016 Capital Improvement Bond.  

    Natalie Pastores, as sophomore at SHS

              
              



    Posted Mar 21, 2019, 3:42 PM by Summer Bowman
  • Progress Video - New High School Site - 3/17/2019
    Please view the most recent aerial video of the progress made at the new high school site, taken on March 17, 2019.  The past week's work included: steel erection, tilt panel pouring, tilt panel preparation for tilting, wall framing, fireproofing of steel members, exterior sheathing, and the completion of the slab on grade in the choir room.


    Posted Mar 21, 2019, 2:34 PM by Summer Bowman
  • Upcoming Bond Oversight Committee Meeting - 3/20/2019
    The Bond Oversight Committee is scheduled to meet on Wednesday March 20, 2019 at 5:30 pm in the Community Room of Edy Ridge Elementary School, 21472 SW Copper Terrace, Sherwood OR 97140.  These meetings are always open to the public.  See the full agenda for the meeting here.  
    Posted Mar 18, 2019, 10:55 AM by Summer Bowman
  • Progress Video - New High School Site - 2/28/2019
    Please view the most recent aerial video of the progress made at the new high school site, taken on February 28, 2019.  The past week's work included: assembly of gym trusses, installation of stairs, tilt panel formation, slab on grade pouring, slab on metal deck pouring, installation of concrete curbs in the west parking lots, exterior framing, and installation of CMU locker room walls.  


    Posted Mar 6, 2019, 4:14 PM by Summer Bowman
Showing posts 1 - 5 of 113. View more »




Bond Proposal

Bond-funded projects will include:

- District-wide safety and security upgrades

- District-wide deferred maintenance

- Curriculum and technology

- Construction of a new high school on a new site

- Costs associated with the issuance of the bond


Project List

Bond funds will support:
  • Construction of a new high school on a new site, with 2,000 student capacity and 2,400 core capacity (expandable total capacity to 2,400 in a future, second phase)
  • Relocating Laurel Ridge and Sherwood Middle to existing high school campus
  • Relocating Hopkins to Sherwood Middle campus
  • Converting The Ridges campus to two elementary schools
  • Relocating District programs and community spaces to existing Hopkins site


FAQ

Answers to some of the frequently asked questions related to Ballot Measure 34-254 can be found in the FAQ linked here.