REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0516u

Preliminary Evaluation Report Writing IEP structure (1 UI)

1,00614,89614,89575,0126,0093,51
Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of the first inspection unit, which collects information from written and graphic building with the aim of analyzing the current state the structure of the building, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property.
%01a%Ancillary costs of labor0,027,37
%02%indirect costs0,0311,05
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0272uStaff time managing administrative proceedings0,5018,089,048,610,50
RE0278uDedication of a technician in the current uprising1,0080,9380,9377,084,00
MOU0063hTechnical. Professional level III (Source: IVE). / More information8,0022,00176,00176,008,00
MOU0064hTechnical Assistant / Draftsman higher. Professional level V (Source: IVE). / More information4,0020,5882,3282,324,00
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information2,0025,0050,0050,002,00
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information2,0030,0060,0060,002,00
RE0156uFurther reconnaissance, inspection or face intervention1,00115,08115,0899,004,50
RE0159uRecognition of an ocular inspection unit building or premises1,0023,1023,1022,001,00
observations:
The intensity of inspection is subject to minimum considered the ease and access permission from the owners. It is considered independent inspection unit each of the following: every home regardless of the surface; premises for commercial use, warehouse, garage or any other use other than housing on the same level and up to 125 m² of floor area or fraction. Adopted the criteria established by the Guidelines and Preliminary Inspection of concrete structures in existing buildings DRB 6/4 of the Valencian Institute of Building.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 19/03/2018
zone València
observations: Partides relacionades: RE0516, RE0517, RE0518, RE0538.
..........
Validated by
profile
Validated date
observations:
Edit price