REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0475u

Writing and project management in removing barriers (4 elevators)

1,003.874,013.874,012.955,46130,0476,29
Writing project studies and project management for the removal of architectural barriers in a building with 4 lifts, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.
%01a%Ancillary costs of labor0,02
%02%indirect costs0,03
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0451uWriting project to eliminate barriers (4 elevators)1,001.211,201.211,201.034,3849,45
RE0455uProject management in removing barriers (4 elevators)1,00973,20973,20738,2632,13
RE0459uStudy of Health and Safety at removing barriers (4 elevators)1,00441,89441,89332,5613,20
RE0463uStudy on Waste Management in removing barriers (4 elevators)1,00250,00250,00149,816,38
RE0467uCoordination safety and health at removing barriers (4 elevators)1,00731,35731,35547,4822,52
RE0471uWaste Management Coordinator at removing barriers (4 elevators)1,00266,37266,37152,976,36
observations:
Not included under this heading creeks running costs, if any.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 19/03/2018
zone València
observations: Partides relacionades: RE0472, RE0473, RE0474, RE0475.
..........
Validated by
profile
Validated date
observations:
Edit price