CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0472u

Fee removal of technical barriers on building (one elevator)

1,001.585,121.585,12882,5880,5855,68
For technical work for the elimination of architectural barriers on a building with one elevator. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.
%01a%Ancillary costs of labor0,02
%02%indirect costs0,03
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0448uWriting project on removing barriers building (one elevator)1,00363,44363,44241,3227,32
RE0452uProject management to eliminate barriers on building (first lifts)1,00391,41391,41234,9620,96
RE0456uStudy of Safety and Health removing barriers (one elevator)1,00202,43202,43114,508,00
RE0460uStudy Waste Management elimination barriers (one elevator)1,00154,13154,1358,505,00
RE0464uHealth and Safety Coordination removal of barriers (one elevator)1,00299,72299,72164,1413,64
RE0468uWaste Management Coordination removal of barriers (one elevator)1,00173,99173,9969,165,66
observations:
Not included under this heading the cost of running creeks, if necessary to write this project.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 30/04/2014
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?