CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0470u

Waste Management Coordination removal of barriers (3 lifts)

1,00184,74184,7478,246,3942,35
Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with 3 lifts plurifamilar, in according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.
%01a%Ancillary costs of labor0,020,96
%02%indirect costs0,034,13
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0188uFurther work health and safety coordinator (distance <20 km)1,1436,6641,8430,433,04
MOU0063htechnical1,0710,0010,7110,711,07
MOU0066hTechnical coordinator1,1412,5014,2714,271,14
MOU0081hTechnical director1,1420,0022,8322,831,14
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00