CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0460u

Study Waste Management elimination barriers (one elevator)

1,00154,13154,1358,505,0037,95
Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.
%01a%Ancillary costs of labor0,021,17
%02%indirect costs0,034,46
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0063htechnical1,0010,0010,0010,001,00
MOU0064hTechnical assistant2,008,0016,0016,002,00
MOU0066hTechnical coordinator1,0012,5012,5012,501,00
MOU0081hTechnical director1,0020,0020,0020,001,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
profile ?
company: ?
update 00/00/0000
zone ?
observations: Notes de l'autor?
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
edit prices