REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0450u

Writing Project removing barriers (3 lifts)

1,001.108,061.108,06946,2745,2585,40
Writing implementation plan for the elimination of architectural barriers in a building with three lifts, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.
%01a%Ancillary costs of labor0,021,88
%02%indirect costs0,035,60
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0174uDedication of a technical report writing1,7187,92150,09142,956,83
RE0175uDedication of a technical specification writing1,7166,31113,20107,825,12
RE0176uDedication of a technical drafting budget1,7187,92150,09142,956,83
RE0177uDedication of a technical drawing of a graphic section1,7185,60146,13139,166,83
RE0178uData acquisition and leverage current state (1 UI)1,71207,64354,46319,5016,22
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information1,7125,0042,6842,681,71
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information1,7130,0051,2151,211,71
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0150,0050,39
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0640,0042,33
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 19/03/2018
zone València
observations: Partides relacionades: RE0448, RE0449, RE0450, RE0451.
..........
Validated by
profile
Validated date
observations:
Edit price