RE0442u

Execution of comprehensive rehabilitation (1 UI)

1,00401,91401,91244,9621,9660,95
Execution of the works carried out in execution of comprehensive rehabilitation project for the first inspection unit. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.
%01a%Ancillary costs of labor0,021,70
%02%indirect costs0,035,25
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0187uSite visit of the director of implementation (distance <20 km)6,0036,66219,96159,9615,96
MOU0063htechnical2,0010,0020,0020,002,00
MOU0066hTechnical coordinator2,0012,5025,0025,002,00
MOU0081hTechnical director2,0020,0040,0040,002,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
observations:
Works included in the Ley 38/1999 of 5 November, of Ordenación of edificiación.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 30/04/2014
zone València
observations: Partides idèntiques en la formulació: RE0442, RE0443, RE0444, RE0445.
..........