RE0416u

Director of the rehabilitation works (1 UI)

1,00667,68667,68484,0021,0072,49
Construction management implementation plan described in rehabilitation for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.
%01a%Ancillary costs of labor0,023,08
%02%indirect costs0,037,32
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0186uFurther work on the project manager6,0068,88413,28330,0015,00
MOU0063hTechnical. Professional level III (Source: IVE). / More information2,0022,0044,0044,002,00
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information2,0025,0050,0050,002,00
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information2,0030,0060,0060,002,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 18/03/2018
zone València
observations: Partides relacionades: RE0416, RE0417, RE0418, RE0419.
..........