REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0412u

Writing assessment report building IEE (50 IU)

1,00664,04664,04624,1661,2193,99
Writing Assessment Report of buildings (IEE), a building with 50 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.
%01a%Ancillary costs of labor0,028,37
%02%indirect costs0,0312,56
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0272uStaff time managing administrative proceedings4,258,4035,7034,004,25
RE0271uDedication of the technical documentation online registration0,5010,505,255,000,50
MOU0063htechnical22,0010,00220,00220,0022,00
MOU0064hTechnical assistant11,008,0088,0088,0011,00
MOU0066hTechnical coordinator3,4012,5042,5042,503,40
MOU0081hTechnical director3,4020,0068,0068,003,40
RE0153uDisplacement of a technician (distance intervals of 10 km or fraction)2,007,8315,666,660,66
RE0159uRecognition of an ocular inspection unit building16,0010,50168,00160,0016,00
observations:
The price includes the evaluation of the condition, the evaluation of the basic conditions of accessibility and universal certification of energy efficiency of the building, as stated in the "Law 8/2013 of 26 June, of rehabilitation, renovation and urban regeneration '. It also includes the management of the registration certificate in the registry but not the payment of visa fees or professional school. It is considered independent inspection unit each of the following: every home regardless of the surface; premises for commercial use, warehouse, garage or any other use other than housing on the same level and up to 200 m² of floor area or fraction. The intensity of inspection comes from the minimum considered 'Guide Assessment Report of the Building. Comunidad Valenciana 'and is subject to the ease of access and permission from the owners.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 12/07/2016
zone València
observations:
..........
Validated by Maigualida Soler Falcó
Validated date 07/11/2016
observations:
edit prices