CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0408u

Writing project management and rehabilitation cranes (20 IU)

1,002.005,342.005,341.480,9765,8073,85
Writing project studies and project management for the rehabilitation intervention cranes 20 inspection units, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.
%01a%Ancillary costs of labor0,02
%02%indirect costs0,03
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0191uWriting rehabilitation project cranes (20 IU)0,60944,38566,63477,5622,83
RE0194uProject management rehabilitation cranes (20 IU)0,60784,56470,74342,1915,13
RE0197uStudy of Safety and Health Rehabilitation cranes (20 IU)0,60363,01217,81154,466,30
RE0199uWaste Management Studio rehabilitation cranes (20 IU)0,60297,56178,54117,074,99
RE0402uHealth and Safety Coordination rehabilitation façade (20 IU)0,60650,03390,02278,8511,94
RE0405uWaste Management Coordination rehabilitation façade (20 IU)0,60302,66181,60110,844,61
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 19/03/2018
zone València
observations: Partides relacionades: RE0189, RE0407, RE0408, RE0409.
..........