CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0402u

Health and Safety Coordination rehabilitation façade (20 IU)

1,00407,82407,82248,6820,8960,98
Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the rehabilitation of plurifamilar facade of a building with 20 units in operation inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.
%01a%Ancillary costs of labor0,021,65
%02%indirect costs0,035,18
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0188uFurther work health and safety coordinator (distance <20 km)6,2336,66228,42166,1116,57
MOU0068hspecialist1,4425,0035,9035,901,44
MOU0066hTechnical coordinator1,4412,5017,9517,951,44
MOU0081hTechnical director1,4420,0028,7228,721,44
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00