RE0295u

Waste Management Coordination repair construction element (1 UI)

1,00184,68184,6877,003,5041,69
Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the repair of an item constructive intervention in the first inspection unit in accordance with the established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.
%01a%Ancillary costs of labor0,020,44
%02%indirect costs0,033,36
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0499uVisit the work of coordinating waste management1,0068,8868,8855,002,50
MOU0063hTechnical. Professional level III (Source: IVE). / More information1,0022,0022,0022,001,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
observations:
It is considered a constructive element constructive elements of each group with similar characteristics that can be treated unitary and homogeneous (eg doors, windows, beams, slabs, etc.).
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 18/03/2018
zone València
observations: Partides relacionades: RE0265, RE0266, RE0267, RE0268, RE0269, RE0270, RE0294, RE0295 i RE0296.
..........
Validated by
profile
Validated date
observations:
Edit price