Study on Waste Management in repair construction element (1 UI)

1,00159,01159,0163,163,0039,72
Writing Study Waste Management for the works described in the implementation plan for the repair of an item constructive intervention in the first inspection unit in accordance with the provisions of the Real Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.
%01a%Ancillary costs of labor0,021,26
%02%indirect costs0,034,59
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0063hTechnical. Professional level III (Source: IVE). / More information1,0022,0022,0022,001,00
MOU0064hTechnical Assistant / Draftsman higher. Professional level V (Source: IVE). / More information2,0020,5841,1641,162,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
observations:
It is considered a constructive element constructive elements of each group with similar characteristics that can be treated unitary and homogeneous (eg doors, windows, beams, slabs, etc.).
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 18/03/2018
zone València
observations: Partides relacionades: RE0265, RE0266, RE0267, RE0268, RE0269, RE0270, RE0294, RE0295 i RE0296.
..........
Validated by
profile
Validated date
observations:
Edit price