REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0268u

Execution repair construction element (1 UI)

1,00253,56253,56132,006,0052,06
Execution of the works described in implementation plan for the repair of an item constructive intervention in the first inspection unit. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and emission certificate end of work.
%01a%Ancillary costs of labor0,020,44
%02%indirect costs0,033,36
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0187uVisit the work of director execution2,0068,88137,76110,005,00
MOU0063hTechnical. Professional level III (Source: IVE). / More information1,0022,0022,0022,001,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
observations:
It is considered a constructive element constructive elements of each group with similar characteristics that can be treated unitary and homogeneous (eg doors, windows, beams, slabs, etc.).
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 18/03/2018
zone València
observations: Partides relacionades: RE0265, RE0266, RE0267, RE0268, RE0269, RE0270, RE0294, RE0295 i RE0296.
..........
Validated by
profile
Validated date
observations:
Edit price