CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0267u

Project management in repair construction element (1 UI)

1,00253,56253,56132,006,0052,06
Management works described in implementation plan for the repair of an item constructive intervention in the first inspection unit. Includes visits to work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the state of the works.
%01a%Ancillary costs of labor0,020,44
%02%indirect costs0,033,36
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0186uFurther work on the project manager2,0068,88137,76110,005,00
MOU0063hTechnical. Professional level III (Source: IVE). / More information1,0022,0022,0022,001,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
observations:
It is considered a constructive element constructive elements of each group with similar characteristics that can be treated unitary and homogeneous (eg doors, windows, beams, slabs, etc.).
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 18/03/2018
zone València
observations: Partides relacionades: RE0265, RE0266, RE0267, RE0268, RE0269, RE0270, RE0294, RE0295 i RE0296.
..........
Validated by
profile
Validated date
observations:
Edit price