REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0192u

Writing rehabilitation project cranes (50 IU)

1,00541,99541,99405,5845,9874,83
Writing implementation plan for the rehabilitation of a facade with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes shift a maximum distance of 20 km, visit technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.
%01a%Ancillary costs of labor0,021,11
%02%indirect costs0,034,36
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0174uDedication of a technical report writing1,7035,7060,6957,806,80
RE0175uDedication of a technical specification writing1,7027,3046,4144,205,10
RE0176uDedication of a technical drafting budget1,7035,7060,6957,806,80
RE0177uDedication of a technical drawing of a graphic section1,7034,1358,0255,256,80
RE0178uData acquisition and leverage current state (1 UI)1,7088,12149,80128,6216,42
MOU0066hTechnical coordinator1,7012,5021,2521,251,70
MOU0081hTechnical director1,7020,0034,0034,001,70
RE0153uDisplacement of a technician (distance intervals of 10 km or fraction)2,007,8315,666,660,66
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 10/10/2016
zone València
observations:
..........
Validated by Maigualida Soler Falcó
Validated date 01/02/2017
observations:
edit prices