REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0189u

Fee technical rehabilitation façade (housing)

1,00808,01808,01415,0738,5751,37
Technical work for the rehabilitation and facade of a house. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the façade restoration project drafting, drafting Annex scaffolding writing study health and safety, preparation of study on waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes: displacement in a metropolitan area to a maximum distance of 20 km.
%01a%Ancillary costs of labor0,02
%02%indirect costs0,03
Estimating the degree of difficulty or uncertainty (normal 1.00)0,60
RE0185uWriting facade rehabilitation project (housing)1,00363,44218,06144,7916,39
RE0181uProject management rehabilitation of housing front1,00283,97170,3889,488,18
RE0179uStudy of Safety and Health Rehabilitation front of a house1,00181,43108,8653,704,20
RE0180uStudy Waste Management crane rehabilitation (housing)1,00154,1392,4835,103,00
RE0183uHealth and Safety Coordination house facade renovation1,00189,74113,8450,503,40
RE0184uWaste Management Coordination facade renovation building house1,00173,99104,3941,503,40
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 10/10/2016
zone València
observations:
..........
Validated by Maigualida Soler Falcó
Validated date 01/02/2017
observations:
edit prices