REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0180u

Study Waste Management crane rehabilitation (housing)

1,00154,13154,1358,505,0037,95
Writing Study Waste Management for the works described in the implementation plan for the rehabilitation of the facade of a house in accordance with the provisions of Royal Decree 105/2008, of 1 in February 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.
%01a%Ancillary costs of labor0,021,17
%02%indirect costs0,034,46
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0063htechnical1,0010,0010,0010,001,00
MOU0064hTechnical assistant2,008,0016,0016,002,00
MOU0066hTechnical coordinator1,0012,5012,5012,501,00
MOU0081hTechnical director1,0020,0020,0020,001,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 10/10/2016
zone València
observations:
..........
Validated by Maigualida Soler Falcó
Validated date 01/02/2017
observations:
edit prices