REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0164u

Preparation of Waste Management Study for rehabilitation cranes (10 IU)

1,00177,38177,3880,656,9045,47
Writing Study Waste Management for the works described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 10 units in operation inspection, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.
%01a%Ancillary costs of labor0,021,61
%02%indirect costs0,035,12
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0063htechnical2,0010,0020,0020,002,00
MOU0064hTechnical assistant2,308,0018,4018,402,30
MOU0066hTechnical coordinator1,3012,5016,2516,251,30
MOU0081hTechnical director1,3020,0026,0026,001,30
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0050,0050,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,0040,0040,00
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 27/02/2015
zone València
observations:
..........
Validated by Maigualida Soler Falcó
Validated date 26/03/2015
observations:
edit prices