REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0122u

Aids palette for the implementation of coves (20 IU)

1,00600,48600,48483,6030,0080,54
Aid for the replacement pallet bays executed in a building with 20 units of inspection, involving the replacement of siding and paint on the affected area, size no greater than 0,50x0,50 m, without providing materials 'finished. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or unique siding replacement.
%01a%Ancillary costs of labor0,029,67
%02%indirect costs0,0317,21
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0180uAnd auxiliary equipment for the execution of tastings structural elements or building construction.2,0045,0090,00
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information15,0017,93268,95268,9515,00
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information15,0014,31214,65214,6515,00
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 19/03/2018
zone València
observations:
..........
Validated by
profile
Validated date
observations:
Edit price