STAGECOACH DEVON LTD B PH1020951.074

PTI SCD
    B • Marsh Barton Met Office •  Stagecoach Devon Ltd • PH1020951.074  • 27 OCT 2003 ► 06 JUL 2013
    B      Marsh Barton Dawlish      STAGECOACH DEVON LTD PH1020951.074       07 JUL 2013 ► 29 MAR 2015
    B     Marsh Barton Exminster     STAGECOACH DEVON LTD PH1020951.074      30 MAR 2015 ►25 JUN 2015
    B 2B • EDF Monkerton Dawlish •  Stagecoach Devon Ltd • PH1020951.074  • 26 JUN 2015 ►

    26 MAY 2019


    29 OCT 2017

    Timetable

    B

    13 OCT 2017

    • Licence: PH1020951.074
    • Operator: STAGECOACH DEVON LTD
    • Address: Matford Park Depot, Stagecoach South West, Matford Park Road, Exeter, EX2 8FD, GB
    • Route Number: B (B, 2B)
    • Start Point: EDF Energy
    • Via: 0
    • End Point: Exminster & Dawlish
    • Other Details: Exeter Bus Station closure postponed. To continue to use Exeter Bus Station.
    • Received: 13-Oct-17
    • Effective: 29-Oct-17
    • Accepted: 17-Oct-17
    • End Date: 00-Jan-00
    • Event Type: Variation applications
    • N & P: 2618
    • d: Applications to Vary Existing Services Granted Under Short Notice (3.4)
    • Initial Published: DT074
    • Final Published: DT074

    24 SEP 2017

    Timetable

    15 SEP 2017

    • Licence: PH1020951.074
    • Operator: STAGECOACH DEVON LTD
    • Address: Matford Park Depot, Stagecoach South West, Matford Park Road, Exeter, EX2 8FD, GB
    • Route Number: B (B, 2B)
    • Start Point: EDF Energy
    • Via: 0
    • End Point: Exminster & Dawlish
    • Other Details: To revise route and timetable
    • Received: 15-Sep-17
    • Effective: 29-Oct-17
    • Accepted: 27-Sep-17
    • End Date: 00-Jan-00
    • Event Type: Variation applications
    • N & P: 2615
    • d: Applications to Vary Existing Services Granted Under Short Notice (3.4)
    • Initial Published: DT072C
    • Final Published: DT073


    05 SEP 2017

    • Licence: PH1020951.074
    • Operator: STAGECOACH DEVON LTD
    • Address: Matford Park Depot, Stagecoach South West, Matford Park Road, Exeter, EX2 8FD, GB
    • Route Number: B (B, 2B)
    • Start Point: EDF Energy
    • Via: 0
    • End Point: Exminster & Dawlish
    • Other Details: To introduce early morning journeys from Pinhoe
    • Received: 05-Sep-17
    • Effective: 24-Sep-17
    • Accepted: 07-Sep-17
    • End Date: 00-Jan-00
    • Event Type: Variation applications
    • N & P: 2612
    • d: Applications to Vary Existing Services Granted Under Short Notice (3.4)
    • Initial Published: DT071
    • Final Published: DT071

    03 SEP 2017

    • The majority of journeys will serve the Pinhoe loop instead of EDF Energy. Peak time journeys will serve both. The revised timetable will also provide better spacing in-between route 2 to/from Exminster

    Timetable
    route map B

    Map 2B

    06 JUL 2017

    • Licence: PH1020951.074
    • Operator: STAGECOACH DEVON LTD
    • Address: Matford Park Depot, Stagecoach South West, Matford Park Road, Exeter, EX2 8FD, GB
    • Route Number: B (B, 2B)
    • Start Point: EDF Energy
    • Via: 0
    • End Point: Exminster & Dawlish
    • Other Details: To revie route to serve Pinhoe
    • Received: 07-Jul-17
    • Effective: 03-Sep-17
    • Accepted: 11-Jul-17
    • End Date: 00-Jan-00
    • Event Type: Variation applications
    • N & P: 2604
    • c: Applications to Vary Existing Services (3.3)
    • Initial Published: DT067
    • Final Published: DT069

    05 SEP 2016 

    • From Mon-Sat we are introducing a number of new journeys on this service. These will replace some of the journeys on our early morning Y service, which is being withdrawn.
    • On Saturdays the 1923 from EDF to the City Centre will no longer run.
    • On Sundays there will be a new timetable operating between Exminster and EDF only and the last bus will leave Exeter at 1810.
    Timetable

    08 JUL 2016 

    • PH1020951/74 - 
    • STAGECOACH DEVON LTD T/A STAGECOACH SOUTH WEST, 
    • BELGRAVE ROAD, EXETER, EX1 2LB 
    • Variation Accepted: 
    • Operating between EDF Energy 
    • and Exminster & Dawlish 
    • given service number B/2B 
    • effective from 05-Sep-2016. 
    • To amend Timetable.

    26 JUNE 2015                                                                                                                    



    Due to the closure of Pinn Lane, our B service will no longer serve the Met Office or Honiton Road Park and Ride. The service will finish at EDF Energy.

     

    Please use the stops on Cumberland Way,  Ambassador Drive or Grenadier Way, served by the new B route


    Timetable


    B Monkerton - Exminster

    17 JUNE 2015 

    • PH1020951/74 
    • STAGECOACH DEVON LTD T/A Stagecoach South West, BELGRAVE ROAD, EXETER, EX1 2LB 
    • Variation Accepted by SN: 
    • Operating between EDF Energy and Exminster & Dawlish 
    • given service number B/2B 
    • effective from 26-Jun-2015. 
    • To amend Route.

    30 MAR 2015                                                                                                                               



    From 30th March the B will no longer serve Starcross, Dawlish Warren or Dawlish and will revert to finishing at Exminster. This is following the end of 12 months of funding by Devon County Council to cover the extension to Dawlish which, unfortunately, did not generate enough additional passengers to make it sustainable once the funding period ended. At the same time, we also took the opportunity to look at the B extension from Dawlish Warren into Exeter, which had been introduced following the withdrawal of the Hop2.

    The review showed that the service is little used: the train station is located a few yards away from the main bus stop and the more frequent bus connections between Dawlish Warren and Dawlish attract the majority of use. Therefore the decision was taken to also withdraw this service.

    However a new 2B service is being introduced which will maintain popular peak hour connections between Dawlish and Matford. There will be two early and two afternoon journeys Monday to Friday and one early morning and two afternoon journeys on Saturdays. The new, combined Hop2/2B timetable provides a bus up to every 15 minutes in the peak hour, an improvement on the current every 20 minutes frequency.

    The once a day 2A journey from Dawlish Warren is also being withdrawn. Customers from Dawlish Warren can continue to use the Hop11, which runs up to every half hour 7 days a week, to travel from Dawlish Warren to connect onto the Hop2 (and 2B) at Dawlish.

    Timetable PDF


    Stagecoach Route-B 2015-03-30

    3 FEB 2015                                                                                                                        

    • PH1020951/74 STAGECOACH DEVON LTD T/A Stagecoach South West, 
    • BELGRAVE ROAD EXETER EX1 2LB 
    • Operating between Met Office and Exminster & Dawlish given service number B/2B 
    • effective from 30Mar 2015. To amend Timetable.

    2 JUN 2014                                                                                                                                 

    Timetable PDF


    Stagecoach Route-B 2014-06-02

    20 MAY 2014                                                                                                                     

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE ROAD EXETER EX1 2LB 
    • Operating between Met Office and Dawlish or Dawlish Warren given service number B 
    • effective from 02-Jun-2014. To amend Timetable.

    05 APR 2014                                                                                                                     

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE ROAD EXETER EX1 2LB 
    • Operating between Met Office and Dawlish or Dawlish Warren given service number B 
    • effective from 02-Jun-2014. To amend Timetable.

    31 JUL 2013                                                                                                                      

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE ROAD EXETER EX1 2LB 
    • Operating between Met Office and Dawlish or Dawlish Warren given service number B 
    • effective from 30-Sep-2013. To amend Route and Timetable.

    9 MAY 2013                                                                                                                       

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE ROAD EXETER EX1 2LB 
    • Operating between Met Office and Dawlish or Dawlish Warren given service number B 
    • effective from 07-Jul-2013. To amend Timetable.

    7 DEC 2012                                                                                                                       

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE ROAD EXETER EX1 2LB, GB 
    • Operating between Met Office and Marsh Barton given service number B 
    • effective from 04-Feb-2013. To amend Route and Timetable.

    25 MAR 2013                                                                                                                    

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE ROAD EXETER EX1 2LB 
    • Operating between Met Office and Exminster given service number B 
    • effective from 27-May-2013. To amend Route and Timetable.

    23 MAY 2012                                                                                                                    

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE ROAD EXETER EX1 2LB, GB 
    • Operating between Met Office and Marsh Barton given service number B 
    • effective from 24-May-2012. To amend Route.

    8 FEB 2011                                                                                                                       

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE ROAD EXETER EX1 2LB 
    • Operating between Met Office and Marsh Barton given service number B 
    • effective from 11-Apr-2011. To amend Route and Timetable.

    10 JUN 2008                                                                                                                     

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE RD EXETER EX1 2LB 
    • Operating between MARSH BARTON and PINHOE / MET OFFICE given service number B 
    • effective from 27-Oct-2008. To amend Timetable.

    23 OCT 2007                                                                                                                                      

    • PH1020951/74 STAGECOACH DEVON LTD, BELGRAVE RD EXETER EX1 2LB 
    • Operating between MARSH BARTON and PINHOE / MET OFFICE given service number B 
    • effective from 26-Nov-2007. To amend Route, Stopping Places and Timetable.

    10 APR 2007

    • Licence: PH1020951.074
    • Operator: STAGECOACH DEVON LTD
    • Address: BELGRAVE ROAD  EXETER, DEVON, EX12LB
    • Route Number: B
    • Start Point: MARSH BARTON
    • Via: CITY CENTRE
    • End Point: PINHOE / MET OFFICE
    • Other Details: 0
    • Received: 07-Mar-2007
    • Effective: 10-Apr-2007
    • Accepted: 07-Mar-2007
    • No end date
    • Event Type: Variation applications
    • N & P:  NP2317
    • N & P Section: 3.4 Applications to Vary Existing Services Granted Under Short Notice
    • Event Description:  To amend Route and Timetable.
    • Final Published: 0
    • VOSA: PH1020951/74
    • 0

    27 FEB 2005

    • Licence: PH1020951.074
    • Operator: STAGECOACH DEVON LTD
    • Address: BELGRAVE ROAD  EXETER, DEVON, EX12LB
    • Route Number: B
    • Start Point: MARSH BARTON
    • Via: CITY CENTRE
    • End Point: PINHOE / MET OFFICE
    • Other Details: 0
    • Received: 21-Dec-2004
    • Effective: 27-Feb-2005
    • Accepted: 21-Dec-2004
    • No end date
    • Event Type: Variation applications
    • N & P:  NP2259
    • N & P Section: 3.3 Applications to Vary Existing Services
    • Event Description:  To amend Timetable.
    • Final Published: 0
    • VOSA: PH1020951/74

    27 OCT 2003

    • Licence: PH1020951.074
    • Operator: STAGECOACH DEVON LTD
    • Address: BELGRAVE ROAD  EXETER, DEVON, EX12LB
    • Route Number: B
    • Start Point: MARSH BARTON
    • Via: CITY CENTRE
    • End Point: PINHOE / MET OFFICE
    • "Other Details: MONDAYS TO SATURDAYS, EVERY 30 MINUTES
    • TIMETABLE 'A' OPERATES UNTIL PINN LANE & EMPORER WAY ARE OPEN, THEN TIMETABLE 'B'WILL OPERATE (PLANNED FOR 1ST DECEMBER 2003)"
    • Received: 16-Oct-2003
    • Effective: 27-Oct-2003
    • Accepted: 16-Oct-2003
    • No end date
    • Event Type: regsiration
    • N & P:  
    • N & P Section: 
    • Event Description:  New registration
    • Final Published: 0
    • VOSA: PH1020951/74


    Comments