CLIENT PROJECT NAME PROJECT NO START DURATION ( MM-YY to MM-YY)
PREMIER OIL Blanket of General Fabrication and Routine Maintenance Services for Operation Facilities OB-16130064 2017 2017-2019
PERTAMINA EP ASET 2 Pembangunan Pipeline dengan sistem kontrak COO di wilayah kerja asset 2 EPR2-S16LL0023A-P30 2017 2017-2019
PT Chevron Pacific Indonesia (CPI) Contract Service for maintenance and repair HCT Pipeline CW1348030 2016 2016-2018
PT Chevron Pacific Indonesia (CPI) Drilling & Completion Maintenance and Support Services C1046803 2015 2015-2018
CNOOCSES Surface Facilities, Structure and Pipeline Maintenance, No. 353080540 353080540 2014 2014
PHE ONWJ Fabrication, Installation And Maintenance Services STC 0902 2014 2014-2017
PT Chevron Pacific Indonesia (CPI) Water Treating Plan Equipment Meintenance Services C902527 2012 2012-2015
PT Chevron Pacific Indonesia (CPI) Maintenance and Repair Services for building houses in Dumai and Bangko Area CW839677, CW968120 2012 2012-2013
NUSANTARA REGAS Jasa Fabrikasi untuk Keperluan Tie-in Fase II (Tj Priok) ke Pipa PHE ONWJ No. 2800/NR/T000/P/X/2012 2012 2012-2013
PHE ONWJ Fabrication, Installation And Maintenance Services STC 0620; STC 0822, STC 0851, STC 0867 2011 2011-2013
PERTAMINA EP ASET 2 Operation and Maintenance Fasilitas Produksi Penyaluran Minyak Bersama di Sumbagsel 3900074637 2011 2011-2015
PT Chevron Pacific Indonesia (CPI) Steam Rate Measurement Services C729823 2011 2011-2014
PT PERTAMINA RU IV CILACAP Retubing Furnace 011F-101 S10PL1025A 2010 2010
PT ADARO - PT PERTAMINA UBEP TANJUNG Trunkline Pipe 6” schedule 40 Block Station Tapian Timur ke Station Pengumpul Utama Manunggul Kalimantan Selatan - 2009 2009
PT Chevron Pacific Indonesia (CPI) Water Treating Plan Equipment Meintenance Services CW652723 2009 2009-2012
PT Chevron Pacific Indonesia (CPI) Welding Services 7329-OK 2008 2008-2011
PT Chevron Pacific Indonesia (CPI) Repair Test, Inspection, Pressure Safety & Relieve valve (Perbaikan, Pengetesan dan Inspeksi Katup Pengaman Bertekanan) 8170-OK 2008 2010
PT Chevron Pacific Indonesia (CPI) Maintenance, Repair & Commisioning Instrumentation Services 10310-OK 2008 2008-2011
PT Pertamina RU II Dumai Preventive Maintenanca for Mechanical/rotating, electrical, Instrument Equipment Dumai Plant 2098/E12028/UMPH/2008 2008 2008-2010
PT Chevron Pacific Indonesia (CPI) Water Treating Plan Equipment Meintenance Services 10068-OK 2008 2008-2009
PT Chevron Pacific Indonesia (CPI) Integrated Maintenance Services Contract for FOM HCT (Facilities Owner Maintenance HydroCarbon Transport) 22572-OK & C676710 2008 2008-2009
BP BERAU Tangguh Operation LNG Plant Mechanical Maintenance Services STCU0016A, 4420000631,  2008 2008-2015
PT Chevron Pacific Indonesia (CPI) Jasa-jasa Operasi Perawatan dan Fasilitas Penunjang Drilling 4872-OK 2007 2007-2008
PT Chevron Pacific Indonesia (CPI) Jasa-jasa Pendukung Operasi dan Pemeliharaan Fasilitas Produksi di SLN (Operations Maintenance & Support Services (OMSS)) 7610-OK 2007 2007
PT Chevron Pacific Indonesia (CPI) Jasa-jasa Pendukung Operasi dan Pemeliharaan Fasilitas Produksi di SLN 4519-OK 2007 2007-2010
PT Chevron Pacific Indonesia (CPI) Manual Well Test 9204-OK 2007 2007
PT Chevron Pacific Indonesia (CPI) Jasa-jasa Pendukung Operasi dan Pemeliharaan Fasilitas Produksi di Drilling 10501-OK 2007 2007-2010
PT Chevron Pacific Indonesia (CPI) Jasa-jasa pendukung Operasi dan Pemeliharaan Fasilitas Produksi di Bekasap & Drilling (addendum 1) 3673-OK 2006 2006
PT Chevron Pacific Indonesia (CPI) Inspeksi, Perbaikan, Sertivikasi, Kalibrasi, Komisioning peralatan Instrument untuk Peralatan Produksi 3651-OK 2006 2006-2008
PT Chevron Pacific Indonesia (CPI) Jasa-jasa pendukung Operasi dan Pemeliharaan Fasilitas Produksi di Bekasap & Drilling (addendum 2) 2006 2006
PT Chevron Pacific Indonesia (CPI) Jasa-jasa Operasi Perawatan dan Fasilitas Penunjang Produksi di SLN, Drilling & MSS 3986-OK & 3640-OK 2006 2006-2007
PT META EPSI AMDAL for Ethane Plus Extraction Project (EPEP) - PT Badak NGL) C-05006 2005 2005
PT META EPSI Lift Station Project of Area IV, HOP III and PC 5/6 Millenium (PT Badak NGL) C-04126 2005 2005
PT CHANDRA ASRI Additional Manpower, tool, equipment & Consumable material for Mechanical work during Shut Down Maintenance No.027/CSA/CA.05 AMD-1 2005 2005
PT CHANDRA ASRI Mechanical RDM Work Contract No.003/CSA/CA.05 2005 2005-2006
KALREZ Petroleum Ltd Renewal Production Sharing Contract Bula Block Oilfield Seram Island No. C/0705-KPS/01 2005 2005-2007
PT Chevron Pacific Indonesia (CPI) Manual Well Test 2666-OK 2005 2005-2007
PT BADAK NGL Pengecatan Vessel, Piping & Structure Plant 32, 38 & 20 C-05069 2005 2006
PT Chevron Pacific Indonesia (CPI) Repair Test, Inspection, Pressure Safety & Relieve valve 2913-OK 2005 2007
PT BADAK NGL Cold Box 15E-4 Exchanger Replacement at Plant#15 C-04082 2004 2004
PT Caltex Pacific Indonesia (CPI) Jasa-jasa pendukung Operasi dan Pemeliharaan Fasilitas Produksi di Bekasap & Drilling No.SP-143/PS/PT.MMP/03 2004 2004-2006
PT META EPSI Pembuatan Tanki BBM Premium, Kerosene, Solar dan Interface (Pertamina Depot Rewulu Teras) No.010-SPK-M01-P-20 & No.010-SPK-M01-P-60 2003 2003-2004
PT BADAK NGL Train A 1C-2 Permanent Repair C-03040 2003 2003
PT PENI Supply Manpower for Plant Maintenance Service CON-E-026673 2003 2003-2004
PT META EPSI Pengecatan Peralatan dan Pemeliharaan Fibre Glass/PVC di area  Zone I/II / III (PT Badak NGL) C-01393 2002 2002
PT BADAK NGL Penggantian Exchanger F4E-5A/B, F4E-6A/B & H4E-1A/B C-01173 2002 2002
PT BADAK NGL Plant Maintenance Contract C-01079 2002 2002-2004
PT META EPSI Pengecatan Peralatan Kilang dan Pemeliharaan Fibre Glass/PVC di Daerah Zone I, II & III (PT Badak NGL) 2001 2001-2003
PT INDONESIA POWER Retubing & Pemasangan HP Heater No 5 ex unit 1 PLTU Suralaya PJ/063/P2000 2001 2001
PT PENI Supply Manpower for Plant Maintenance Service CON-E-024138 2001 2001-2003
PT BADAK NGL Plant Maintenance Contract II (Pipeline Maintenance, Mechanical-Static Equip, Skill labour Supply) C-99094 2000 2000-2001
PT META EPSI Pengecatan & Pencegahan Lumut di Tanki LGN 24-D 3/4 dan Perbaikan Sealant di Bottom Tanki LNG 24-D-4/5 (PT Badak NGL) C-99094 1999 1999
PT BADAK NGL Train B Piping Replacement & F1E-4A-F Demolition, Plant #1 Upgrade 1999 1999
PT CHANDRA ASRI Turn Around Maintenance Services Plant CAPC (Blind&Reblind, Cleaning, Overhaul, Cleaning&Alignment, Repair&recertification, Modification Job) 1999 1999
PT CHANDRA ASRI Tank Reparation ( ACID Tank) 1998 1998
PT CHANDRA ASRI Erection & Installation of K.O. Drum 1998 1998
PT BADAK NGL Plant Maintenance Contract I (Pipeline Maintenance, Mechanical-Static Equip, Skill labour Supply) C-98005 1998 1998-2000
PT META EPSI Installation, Test & Commisioning 40 Bay Substation Convential Pro Jaringan Transmisi & Gardu Induk Jakarta & West Jaca (KE-I PT PLN) 1997 1997-1998
PT CHANDRA ASRI Piping Replacement of Caustic Line Cons. Protection Beton Etheline & Aqua Liquid and etc. 1997 1997
PT NDC Construction Facility Penumpukan Batubara at Pelabuhan Trisakti 1997 1997
PT PPIK Construction Tambatan Tongkang at Pelabuhan Trisakti 1997 1997
PT PLN Wil. I Installation & Test, Jaringan SUTM 20,481 M, STUR TIC 13,031 M, Gardu Trafo 13/95 Ea/kVA 1997 1997
PT Ventech Eng Erection Mini Refinery (PT Humpuss) 1997 1997-1998
PT BADAK NGL Preventive maintenance Boiler 1997 1997-1999
CENTRAFOOD Mechanical & Electrical Design 1996 1996
PT PLN Wil. I SKTM 20 kV 3 x 240 M, 400 M 1996 1996
PT PLN Wil. I Construction Substatic for PT Humpuss Lhokseumawe 1996 1996
PT PLN Wil. I Installation & Test, Jaringan SUTM 12,899 M, STUR TIC 11,736 M, Gardu Trafo 9/225 Ea/kVA 1996 1996
CENTRAFOOD Mechanical & Electrical Centrafood Salam Mie Factory 1996 1996
PT BINARA GUNA MEDIKTAMA Fire Protection System (RS Pondok Indah Extention Project) 1996 1996-1997
PT CHANDRA ASRI Turn Around Maintenance Services Plant CAPC (Blind&Reblind, Cleaning, Overhaul, Cleaning&Alignment, Repair&recertification, Modification Job) 1996 1996
PT KUJANG EURAPIPE Concrete Slab, Trench-pit, Water Line & Drainage, Piping, Ancillary (Karawang) - 1995 1995
PT INECOM Construction of Work Shop at ACPC ( PT Chandra Asri) 1995 1995-1996
PT PLN Wil. I Construction 20 kV Substation & Transmission 1995 1995
PT PLN Wil. I Rehabilitation 1995 1995
PT PLN Wil. I Construction 20 kV Substation & Transmission 1995 1995-1996
PT BADAK NGL Plant site Painting Program in Zone I & II East Kalimantan 1995 1995-1997
PT CHANDRA ASRI Routine/daily maintenance for CAPC Rotating, Special equp, Piping, Civil, Cracking & Boiler and management, Man power supply (Rotating, Mechanical(static), Elec&Instrument, Modification) 1995 1995-1997
PT ARUN NGL Plant Maintenance VI (Mech, elec, Inst, Piping, Skill Labour Supply) - 1994 1994-1995
PT META EPSI Construction of Train A/B, 13,8KV Cable Replacement for CWP, LNG Storage (PT Badak NGL) 1994 1994
PT BADAK NGL Construction of CATV at HOP IV, V, & VI Replacement for CWP, LNG Storage 1994 1994
PT PLN Wil. I Construction Substation & Trasmission 1994 1994
PT BADAK NGL Communication Support for Kutai Lama Radio Station 1994 1994-1996
PT ARUN NGL Technical Service Agreement - 1993 1993
PT META EPSI Zamrud Water Flood Project Gathering system expansion and water cleaning plant Tanks ( PT Caltex, Zamrud Riau) 1993 1993-1994
PT META EPSI Tank Erection Avtur 2x 2.500 Kl, Kerosene 2x 12.500 Kl, Premium 2x 12.500 Kl, Solar 2x 25.000 Kl, Ballast 2x 2.000 Kl Terninal BBM, (Pertamina UUPDN I) 1993 1993-1995
PT META EPSI Construction of CATV at HOP I thru III (PT Badak NGL) 1993 1993
PT META EPSI Automotive, Instrumentation & Metering System (Pertamina UUPDN I) 1993 1993
PT META EPSI Construction of Jetty 35.000 DWT & 6.500 DWT Terminal BBM (Pertamina West Sumatra) 1993 1993
PT BADAK NGL Water Sprinkler System at Water house & Train A,B,C,D &  1993 1993
PT BADAK NGL Train A & B Debottlenecking 1993 1993
PT BADAK NGL Train C & D Debottlenecking 1993 1993
PT ARUN NGL Plant Site AC Maintenance - 1992 1992
PT ARUN NGL Water Sprinkler Train A,B,C,D & Warehouse North Aceh - 1992 1992
PT META EPSI Air Conditioner, Piping & Plumbing, Elec work, CATV Installation (3 FI), Bali Imperial Hotel, Denpasar 1992 1992
PT META EPSI Air Conditioner, Piping & Plumbing, Elec work, CATV Installation (3 FI), Cirebon ( Cirebon Grahatama-CG Part Hotel) 1992 1992
PT META EPSI 24D-5 Tank Base Heating Improvement (PT Badak NGL) 1992 1992
PT BADAK NGL Modify Pipe support at Plant #3, Train A, B, C, D & Warehouse, East Kalimantan 1992 1992
PT ARUN NGL Preventive Maintenance Unit Wrk Automotive Heavy Equip 7 Years - 1991 1991-1997
PT META EPSI Fuel Unloading Facilities Tanjung Priok (Pertamina) 1991 1991-1992
PT META EPSI Transit Terninal for Fuel (Premium, Kerosene, Diesel Fuel & Avtur) at TTL Kabung, West Sumatra(Pertamina) 1991 1991-1994
PT BADAK NGL Preventive Maintenance of Communication Equipment  at Plant & Community area 1991 1991-1995
PT BADAK NGL Cleaning LNG Tanks 24D/1/2/3/4 & Washing LNG Transfer BOG Lines 1991 1991
PT META EPSI Development Project of The University of Andalas Padang 1989 1989
PT META EPSI Electrical Project Extention of PT PINDAD 1989 1989
PT META EPSI Electrical & Mechanical Project PT IPTN 1989 1989-1990
PT META EPSI Water Pipeline - tegal (Cipta Karya) 1988 1988
PT ARUN NGL Plant Maintenance Contract I - IV LNG Arun 5 Years (Mech, Elec, Instr,Piping, Labour Supply) - 1986 1986 - 1991
PT META EPSI Conveyour System, Tankage (16,000 Kl) &Piping system Installation for Asphalt Plant Gresik (Pertamina) - 1986 1986-1988