Ceiling tiles need replaced and Jerry is ready to start.

 
 
The room is ready to start on.
 
 


 


 
 
 
03DEC11

 
 
 
 
 
 
 
 
 

 

 

 

 

12NOV11

 
    
 

 

14NOV11


17NOV11


 
17NOV11

  


18NOV11

Bench removed and walls are ready for work.
Studding is up and insulated.  01DEC11


01DEC11

Bench has been removed and walls are ready for work.
06DEC11 Door jam fixed on outside door.
                                                                         Technical library door installed                                                                                      

06DEC11
 
                                        

12DEC11
   19DEC11                                                          
 
Floor Stripped of old rug and tile.
23DEC11 
   

                 
 

 
Heater units being installed in the Tech. Library.
27DEC11
27DEC11
 
28DEC11

                 
05JAN12


10JAN12

Walls are painted and the CAT 5 cables are pulled in.
18JAN12


Hard work is going on.                                        20JAN12                                Tech Library taking shape.


Emergency light works.                      21JAN12              Tech Library coming along.

Many long days of work by members and contractors are going into the New library rooms.
25JAN12

Rich and Steve working on the AV room.                     27JAN12         Room cleaned out almost ready for the rugs.

A/V room has a new look.                                      05FEB12                              Carpet being put down.

Book case on the move and set.                      07FEB12                           Smart board is hung.

Kim has Smart Board working.               08FEB12                         Barb and Terry loading the library books to the shelves.


First membership meeting in the library.                    11FEB12                           Barb working at her new desk.

Many hours of hard work.                                25FEB12                                Still not completed.