Leeds Cable Bid
Questions Posed: 
1)    Q:Do you also want the switch and AP install included on this bid response?

             A: Yes the separate mini bid for 17 switches and 70 AP's Does not include installation of AP's and Switches so they should be included in the cable bid.  

2)         Q: Do we need to include patch cables and patch panels.    

             A: 1' patch cables for all 70 drops and modular patch panel jacks where needed.

3)         Q:How should switches be configured? 

            A: Switches will be stacked into the existing environment.  Config will be on Dell Switches and copied and pasted from existing equipment.