Project updates


Cost of Revit Coaching In Pune Area

posted May 31, 2018, 11:35 PM by Shadaab Sayyed

The software training and coaching fees in Pune region as studied by Vijay Zurange

Project Plan on Microsoft Project

posted Apr 15, 2018, 8:58 AM by Shadaab Sayyed

I prepared the Gantt chart of the activity duration of the project using MSP. PFA Chart attached to this post. I'm also attaching the MSP file for your reference

Getting Started with Modelling

posted Apr 10, 2018, 2:28 AM by Shadaab Sayyed

It is difficult to integrate too many stuffs in a model, so as we're getting started we shall be referring the document attached in this post.

Initially the architectural model shall be made and then the structural details shall be integrated into the model.

Which documents are essential for Plinth certificate?

posted Feb 3, 2018, 6:04 AM by Gaurank Patil

For Plinth certificate following documents are essential

1.      Application form

2.      Architect letter for Completion of work upto Plinth level

3.      Structural Engineers letter

4.      Structure Design Details drawings

5.      Site actual drawing Details

Note: Documents may vary as per Proposal and case type.


                                                                                                         Source: Pune Muncipal Corporation.

Which documents are essential for Building Completion certificate?

posted Feb 3, 2018, 6:01 AM by Gaurank Patil

Following documents are essential for Building Completion Certificate: 

1.      Application in format

2.      Building Completion certificate from Lic.Arch/Engg

3.      Structure Engineers letter

4.      Property Tax NOC

5.      Completion Affidavit

6.      Garden Department NOC

7.      Fire Department NOC (if required)

8.      Lift NOC (if required)

9.      Mahrashtra State Pollution Control Board NOC (if required)

10.  Part Completion Affidavit (Wherever applicable)

11.  Solar system installation documents

12.  Sewage treatment (STP) NOC (if required)

13.  Vermi composting NOC

Note: Documents may vary as per Proposal and case type.



                                                                                                                               Source : Pune Muncipal Corporation.

what is a procedure of sanctioning of new building proposal?

posted Feb 3, 2018, 5:57 AM by Gaurank Patil   [ updated Feb 3, 2018, 5:58 AM ]

Procedure of sanctioning of new building proposal is as follow

·         Perform PreDCR by Lic.Arch/Engineer

·         Submission of PreDCRvia Online

·         Getting scrutiny challan after submission of proposal

·         Physical submission of file along with paid  scrutiny challan& requisite documents in Building development department

·         Scrutiny of proposal from Building Inspector(AutoDCR cell)

·         Site visit by Building Inspector

·         After completion technical and legal fulfilment in the building proposal, proposal is put up for sanctioning to Deputy Engineer/Executive Engineer (As per Case type)

·         Special Building proposal like Petrol pump, Proposal under R7, Zone change etc are sanctioned by Hon. Municipal Commissioner.

·         development charges/premium charges challans are issued After sanctioning building proposal

·         After payment of challans commencement certificate alongwith drawing  is issued by PMC.



                                             Source: Pune Muncipal Corporation 