1162days since
Project Due Date

Project funded by:


 

Team America is composed of Justin Bounds, Josh Gidlow, Adam Jones, and Deric Nix.  The project consists of performing ASME code calculations on different flange types and attempting to find relationships between the calculated structural stress in the flange to the seal pressure on the gasket between flanges.  Tests will be conducted at the ExxonMobil Chemical Co. site in Baton Rouge, LA to determine the pressures at which different flange configurations leak.

Recent Updates

  • May 7, 2011 Yesterday was the COES senior capstone conference. At this conference Team America presented what was the final presentation on this flange leak project to COES students, faculty, guests, and industrial ...
    Posted May 7, 2011, 8:26 AM by Unknown user
  • April 19, 2011 Today Team America sent off all of the fabrication drawings needed for hydrotesting of the various ASME flanges and pipe spools desired. This was in fact the second set of ...
    Posted Apr 23, 2011, 12:58 PM by Unknown user
  • March 29, 2011 Today Team America gave an updated presentation regarding the status of the project to the rest of the senior mechanical engineering class. This presentation summarized the conclusion of the efforts ...
    Posted Apr 23, 2011, 1:00 PM by Unknown user
Showing posts 1 - 3 of 8. View more »
Comments