Anticipated Scope of Work:
Renovation of existing Fine Arts Academy classroom buildings on the lower campus, Buildings 600 and 700. This project will consist of two phases, with Phase 1being completed in the summer of 2016.  Phase 1 scope includes exterior paint, new roofing, new floor and wall finishes, new windows, refurbishing of existing cabinets, and removal of suspended ceiling system to create an "industrial" look. Technology upgrades are also included. Replacement of concrete sidewalks,  restroom reconstruction and door and hardware replacement to comply with accessibility requirements are planned for Phase 2.