Project Timeline



Phase 1: Pontoon Construction


Day #1


Cutting foam boards to the correct length.

Using 3M Super 77 spray adhesive to glue the foam boards together.


Foam boards were left overnight to set.

Day #2


Testing the hot wire cutter that Jeff built. Much cleaner than a saw.


The hot wire cuts through the foam without any problem.

Day #3


After cutting the big foam board in two, we started shaping the pontoon tips.


Halfway through one tip.


One pontoon tip is finished.

Day #4


Shaping the pontoons by sanding with 120 paper.

Lovely day for sanding.

Phase 2: Frame Construction

Day #5

Welding the frame together

It's starting to look like a boat.

It looks like a boat from this angle too.


Setting up the drive shafts.


Mocking up the frame.


Determining the location of the 16x16 APC props.

Phase 3: Putting It All Together