The Laboratory

 The Steidl Lab is located on the 6th floor of the Chanin Building, Rm. #606 & 636


The Main Lab






 The Tissue Culture Room


The Stem Cell FACS Lab


Our brand-new 5-laser 18-PMT FACS AriaII Special Order System with integrated whole-instrument biosafety cabinet


3-laser 14 PMT FACS Aria I (Aria II fluidics upgrade)


 

Views from Einstein (Ullmann Building Rooftop) -- please click pictures to enlarge !