Placencia Yacht Club

Developer is Placencia Caye Resort and Marina Limited, a Condominium Development (principal, Mike Potoker).

The ECP for the development was signed on 31 May 2006.

The development includes:
  • Sixteen 2-bedroom condominiums in 4 buildings (each building approximately 30'x80' plus verandah)
  • Approx. 20'x50' pool house with 2nd floor apartment
  • Pool, approx. 20'x50'
  • Twenty-four boat slips of approx. 40' x 12'
DOE requirements for development:
  • Access by the public to temporary use of existing pier/boat docking facilities and other amenities
  • Household drainage popes not allowed to empty directly into any wetland area or water body or surrounding environments.  Drainage pipes must empty into adequately designed and constructed elevated and lined leach fields.
  • Water to be piped across Sea from Placencia.
  • Sewage to be processed by an Aquatron 4 treatment system in enough numbers to adequately treat all sewage generated by the development.
  • Treated effluent from wastewater system may be used for irrigation if it meets the Effluent Limitations Regulations of 1995.
  • No wastewater to be discharged directly into any body of water.