F R A M E
Click on links.
1. Gn2design Home page
2. Gn2 DesignHouse build at Mahurangi west
3. Earthworks
The Frame arrives in flat pack form from the factory.
All connections have been pre fitted
Day 1
Portals are assembled on the ground
then lifted into possition.
Beams connect into the post with two internal bolts, one top & bottom
DAY 2
Day 3
Second delivery of frame arrives on site
Day 4 & 5
secondary wall and flooring begins
The best New Zealand has to offer!
Week 2
First floor & Roof beams