The Frame arrives in flat pack form from the factory.

 

 

 

 

 

All connections have been pre fitted  

 

 

 

 

Day 1

 

Portals are assembled on the ground 

then lifted into possition.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Beams connect into the post with two internal  bolts, one top & bottom





DAY 2

 

 

 

 

 

 

 Day 3

 

Second delivery of frame arrives on site

 

 

 

 

 

 

 Day 4 & 5

 

secondary wall  and flooring  begins 

    

  

 

 

The best New Zealand has to offer!



 

Week 2

First floor & Roof beams