| Remove Laminate Flooring in Kitchen and Entry | Josh and Sam | | | July 21, 2008 | | Remove Entry Closet | Josh and Sam | | | July 21, 2008 | | Remove Kitchen Wall | Josh and Sam | | | July 21, 2008 | | Remove Paneling in Man Cave | Josh and Sam | | | July 21, 2008 | | | Add Insulation to Attic | Josh and Sam | | | November 30, 2008 | | Purchase One Storm Door | Josh and Sam | For Front Door | | July 19, 2008 | | Purchase Two Entry Doors | Josh and Sam | Front Door and Basement Door | | July 19, 2008 | | Install Storm Door | Josh and Dad (Matt) | | | July 20, 2008 | | install Entry Doors | Josh and Dad (Matt) | Install Front Door and Basement Door | | July 20, 2008 | | Remove Bushes | Sam and Mom (Pat) | Ones in front of man cave window and Electric meter | | July 20, 2008 | | Removed plywood on hardwood | Josh | | | July 19, 2008 | | Clean Fridge and Bathrooms | Sam | | | July 19, 2008 | | level area for oil tank | Sam | | | August 10, 2008 | | Remove Kitchen Board | Josh | | | July 19, 2008 | | Fix Gutters/ Change Flow | Josh and Sam | | | September 7, 2008 | | Remove shrubs from electricity area | Sam and Mom (Pat) | | | July 20, 2008 | | Remove Tree growing from house | Josh and Sam | | | October 5, 2008 | | Remove all Wallpaper | Sam | Still left: Bedroom Border, Bathroom, and Top of Kitchen | | July 19, 2008 | | | Install New Closet system | Josh | | | August 8, 2008 | | Demo Closets | Josh | | | September 30, 2008 | | Purchase 2 Bathroom Light/Fans | Josh and Sam | | | August 10, 2008 | | | Reframe Closets and Add Doors | Joe | | | August 4, 2008 | | Replace/Rewire the whole house | Mark | Switches, Outlets, Lighting, Add outlets and lighting, attic fan, etc. | | August 1, 2008 | | Sheet Rock "Skylight" and all ceiling In Living Room Dining room and kitchen | Joe | | | August 1, 2008 | | Patch and Sand Holes | Joe | | | August 1, 2008 | | Sheet Rock Den | Joe | | | August 1, 2008 | | Purchase Three Fans without lights | Josh and Sam | For Master Bedroom, Living Room, and Man Cave | | August 10, 2008 | | Purchase Two Fans with Lights | Josh and Sam | Need Fan for Two smaller bedrooms | | August 10, 2008 | | Remove Carpeting | Josh and Sam | | | August 10, 2008 | | Purchase One Vanity Light | Josh and Sam | | | August 10, 2008 | | Refinish Hardwood Floors | Joe | | | August 16, 2008 | | Repair hardwood floors | Joe | | | August 16, 2008 | | Revamp Electric Service Panel | Mark | | | July 21, 2008 | | Prime Whole House | Josh and Sam | | | August 20, 2008 | | Paint Ceilings Throughout the whole house | Josh and Sam Mom (Pat) and Sydney | | | August 24, 2008 | | Paint Walls | Josh and Sam | | | August 24, 2008 | | Purchase Dining Room Light Fixture | Josh and Sam | | | August 10, 2008 | | Install Ceiling Fans | Mark | Will do as soon as we are done painting and purchase fans | | August 22, 2008 | | Paint Hallway | Josh | | | August 21, 2008 | | Install Flooring in Man Cave | Josh and Sam | | | August 23, 2008 | | Downstairs Bathroom- Remove Carpet | Josh and Sam | | | September 14, 2008 | | Clean house pre- move in | Josh and Sam | | | August 30, 2008 | | Painting Touchups and Final Touches | Josh and Sam | | | August 30, 2008 | | | Purchase Downstairs Medicine Cabinet | Josh and Sam | | | December 1, 2008 | | | Downstairs Bathroom- Remove Toilet and Vanity | Josh and Sam | | | December 1, 2008 | | | Install Baseboards | Josh | Install baseboards throughout house | | January 1, 2009 | | | Install Moulding | Josh | Moulding needs to be installed on new doors | | February 1, 2009 | | | Redo Patio | Josh and Sam | | | June 1, 2009 | | | Move Oil Tank | Standard Oil | | | September 30, 2009 | | | Fill Cracks in Foundation | Josh and Sam | | | September 30, 2009 | | | Remove tree leaning over driveway | Josh and Sam | | | October 1, 2009 | | | Downstairs Bathroom - Redo Linen Closet Area | Josh and Sam | | | December 1, 2008 | | | Downstairs Bathroom - Install New Vanity and Toilet | Josh and Sam | | | December 1, 2008 | | | Downstairs Bathroom- Painting and Mouldings | Josh and Sam | | | December 1, 2008 | | | Downstairs Bathroom Completed | Josh and Sam | | | December 21, 2008 | | | Install New Windows | Joe | | | November 30, 2008 | | | Demo Kitchen | Josh and Sam | | | March 1, 2009 | | | Install Kitchen Flooring | Joe | | | March 9, 2009 | | | Downstairs Bathroom - Install New Flooring | Josh and Sam | | | December 1, 2008 | | | Install Kitchen Cabinets | Joe | | | March 16, 2009 | | | Install Countertop and Sink | Joe | | | March 23, 2009 | | | Install Appliances | Joe | | | March 30, 2009 | | | Kitchen Plumbing and Electrical Completed | Joe | | | March 28, 2009 | | | Kitchen Painting and Backsplash completed | Joe, Josh and Sam | | | March 15, 2009 | | | Kitchen Completed | Joe, Josh and Sam | | | April 1, 2009 | | | Chimney Caps | Josh | | | November 2, 2008 | | | Remove Pine Trees | Josh and Sam | | | October 1, 2009 |
Showing 67 items
|