  1. Contact the DC APO
  2. Obtain the keys to an MCOV
  3. Contact MCOV IT to obtain a test frequency.
  4. Perform a Pre-Trip Inspection
If all is well:     (If not, return to step 1 to request another unit)
  1. Start the Generator
  2. Record start-up generator hours.
  3. Initiate satellite system startup.
  4. Assure the Satellite Safety Switch is set so the unit will not start if the sat dish is up.
  5. Pre-stage Accountable Property items. (Laptops and Container #1)
  6. Verify test frequency and test connectivity.
  7. Test the external gator box.
  8. Notify the site APO you are near ready for Check-Out.
  9. Send your first MCOV Status report.
  10. Stow satellite system.
  11. Verify Durable Property.
  12. Perform Check-Out procedures with APO.
    1. Verify All Accountable Property.
    2. Perform VCR inspection.
    3. Sign all necessary documents.
    4. Insert document copies into log book.
  13. Stow remaining articles for transport.
  14. Review your driving route.
Double check:
  1. The satellite dish is in the stowed position.
  2. Exterior compartment doors latched/locked.
  3. Interior doors closed/latched.
  4. Counters clear of potentially rolling or falling objects.
  5. Seat position and mirrors.
Ready for Travel:
  1. Record the Time and Odometer reading.
  2. Notify HQ of your ETA. (allow for stops)
  3. Proceed to your destination.