A New Access Door

New work in the roundhouse to May 8th 2007.

 The stall 12 side of the East firewall. X marks the spot for the new door.

 

The lower section of the ladder has been removed to storage, the door opening outline has been diamond-sawed and work on the lintel has begun.

 

The opposite side of the wall in what is now a storage room.

 

The steel lintel is now in place. Note the new brickwork.

 

Surplus bricks have been removed.

 

The new opening is a forklift access route into the new space which will contain a tank farm and drive-in beer cooler.


Steel channel sides are welded in place and painted safety yellow.