Oct 20th - Dec 16, 2008
After 28 years, it was time to get rid of the linoleum and small tiles and the plan was to replace everything before Christmas. This included, new floor tiles, bathtub enclosure tiles and tub and hardware, counter top and sinks and hardware, toilet, mirror and lighting, basboatrd, and add crown moulding.
(left-click an image to enlarge)
sinks and mirrors before

and after
floor before and after
tub enclosure before and after
toilet area before and after
All done before xmas.
I had begun this work after a 10KM run in Vancouver in late October with Lori.
I noticed some back pain but I was about to begin curling and start the ensuite bathroom.