Home Renovations - Main Bathroom

Oct 20th - Dec 16, 2008

After 28 years, it was time to get rid of the linoleum and small tiles and the plan was to replace everything before Christmas. This included, new floor tiles, bathtub enclosure tiles and tub and hardware, counter top and sinks and hardware, toilet, mirror and lighting, basboatrd, and add crown moulding.  

(left-click an image to enlarge)

sinks and mirrors before

and after

 

floor before and after

 

tub enclosure before and after

toilet area before and after

All done before xmas.

I had begun this work after a 10KM run in Vancouver in late October with Lori.

I noticed some back pain but I was about to begin curling and start the ensuite bathroom. 