You have reached the homepage of the University of Cincinnati's Section of the Society of Women Engineers! Please join us at our next meeting and upcoming events! Check out pictures from Region G Conference at UC at https://picasaweb.google.com/110669975872400682755/RegionGConferenceMarch242012?authkey=Gv1sRgCPrMzraY7fiZ4QE OFFICE HOURS: 650 Baldwin Hall Samantha-MW 11-12 Stefanie- Tuesday 11-12 Olivia-out of town-please contact Samantha for any questions at uc.swe.president@gmail.com Elizabeth-Friday 11-11:45
Our next general meeting is Monday May 14th at 6 PM in 544 Baldwin.
We are having our annual spring banquet. RSVP ended last week! Plan to attend the picnic on May 31st and the CEAS picnic on June 2 co-sponsored by SWE!
Meetings this quarter: May 31-Picnic/Senior Sendoff
T-SHIRTSSupport UC SWE and get a cool t-shirt everyone will be talking about!
T-shirts can be purchased for $10 each at SWE meetings or in 650 Baldwin during office hours. Please email uc.swe.fundraising@gmail.com if you are unable to attend a meeting or office hours.
What Engineers Say vs. What we mean:
- A number of different approaches are being tried.
We are still guessing at this point.
- Preliminary operational test were inconclusive.
The darn thing blew up when we threw the switch.
- The entire concept will have to be abandoned.
The only guy who understood the thing quit.
- All new.
Parts are not interchangeable with previous design.
- Years of development.
One finally worked.
- Extensive report is being prepared on a fresh approach to the problem.
We just hired three kids fresh out of college.
- Please note an initial.
Let's spread the responsibility for the screw up.
- Give us the benefit of your thinking.
We'll listen to what you have to say as long as it doesn't interfere with what we've already done.
- It depends...
Abandon all hope of a useful answer.
- The data bits are flexed through a collectimizer which strips the flow-gate arrays into virtual message elements.
I don't know.
|
|