Large scale wind turbine Q & A
(1)price of wind mill model and approx.delivery time, and separately - price of
1MW US$1.78 million installed
1.5MW US$2 million installed
2MW US$4.06 million installed
3MW US$5.3 million installed
central control US$100,000
tower US$500,000
lead time 6 month or longer
payment:
30% down pay
70% before shipping
business plan US$2000
shipping, duty, tax on top
we provide financial analysis online, here is the link
(2)installation and
15 to 20%
Please fill the requsts for the site.
(3)transportation to Liepaja,
Will you build your own tower?
(4)main electric, mechanic and noise characteristics,
We will provide these info depends on model number.
(5)power curves,
We will provide these info depends on model number (6)certification,
GL or DNV
(7)minimal and suggested distance between w/mills,
minimum distance 100m or 330ft
suggested 10 times of the height of the obstacles
(8)minimal and suggested distance to buildings,
same as above
(9)warranty,
usually 2 years, but you can buy more years when you purchase
US$50000 per unit per year for 1.5 MW
(10)margins against failure under ultimate loads from tech.project,
We do not have data for this.
(11)margins against failure under fatigue loads,
We do not have data for this.
(12)approx.how many installations your company has already.
For now about 200 units by our partner in China.
(13)What maintenance is required,
Check consumable components regularly.
(14)how frequent and
per month or each quarter
(15)what are average costs?
US$25000 estimated per year per unit
(16)Would you provide connection from wind mills to 20kV electricity grid including all the electric equipment, or you require this to be done by customer?
Yes, we can provide transformer with extra costs
(17)What other services do you provide and what is approximate cost estimate?
Please advise your detailed requirements, then we can tell you.
(20)Also what kind of crane would we need on site for instalation? The gen head of 3MW is about 140 ton, the tower is 100m or more.
(21)How long would it take your people to set it up if all the infrastructure would be ready? maybe less than two month, if everything in order.
(22)How much would be the instalation costs per unit? Depends on the situaction, the installed cost for 3MW is about 5.3 million
(23)Can you provide the equipment to link all the gens to suply the power grid? Yes, please provide the detailed requirements of the grid.
(23)How dificult is it to transport these items, can they fit on standard 40ft trailers for inland transport? No, we need some supper size trucks to ship.
(24)Do they need specialized equipment in the seaports for loading and of loading, is it something panalpina can handle? Yes, we do need some special equipments, see the photos on the top of this page.
(25)How long would it take for delivery and manufacture? 6 months from payments(26)Do we need FAA permit?
CFR Title 14 Part 77.13 states that any person/organization who intends to sponsor any of the following construction or alterations must notify the Administrator of the FAA:
|