This year we moved into a studio at Central School Project. We have the use of the wonderful little theater on the third floor. CSP has installed a chair lift to spirit patrons to the upper levels. 43 Howell Avenue Bisbee AZ 85603 It's the third building past the Copper Queen Hotel on the right. Look for a yellow school building with a chain-link fence. Central School Project |