Home
Exhibit working groups
Exhibit Bubble Plan (as of 3-13-2009)
Photos from Flickr collection that we'd like originals to scan
Objects and images we'd like to borrow from the Cape Verdean Museum
Schedule
Fox Point Exhibit Design Schedule
3/13/09 (FRI) KICK-OFF MEETING
• Draft bubble plan
• Draft Schedule
• Discuss Budget
3/20/09 (FRI) BASICS DUE
• Exhibit Title
• Any images available (either for reference or for use in exhibit)
• Recruit student muralist if possible
3/23-29/09 (WEEK) SPRING BREAK
4/3/09 (FRI) SCHEMATIC CONTENT DUE
• Content outlines for all sections
• Draft prop lists for all sections
• Any images available
• Any available or desired artifacts
• Draft text and images for one section
4/3/09 (FRI) SCHEMATIC DESIGN MEETING
• Review Exhibit Title design
• Review Color Palette
• Refine prop lists for all sections
• Discuss sets and large-scale imagery
• Review budget
4/8/09 (WED) REFERENCES DUE
• Reference images for sets and murals
4/10/09 (FRI) DRAFT CONTENT DUE
• Complete text and images for brochure
• Complete text and images for exhibit intro
• Draft intro text and images for all sections
• Draft artifact lists for all sections
• Any images to be used large-scale
4/10/09 (FRI) DESIGN DEVELOPMENT SUBMITTAL
• Revised Exhibit Title and Color Palette
• Exhibit panel design for one section
• Set drawings with revised/notated prop lists for all sections
4/17/09 (FRI) REVISED CONTENT DUE
• Complete text (including labels) and images for all sections
4/17/09 (FRI) FINAL DESIGN MEETING
• Review brochure design
• Review exhibit intro design
• Review revised intro panel design for all sections
• Review set and installation materials list
4/19/09 (SUN) FINAL BROCHURE CONTENT DUE
• All text and images edited and proofed
4/23/09 (WED) FINAL BROCHURE DESIGN SUBMITTAL
• Final brochure design submitted for sign-off
• Brochure goes to press by 4/24/09
4/24/09 (FRI) FINAL CONTENT DUE
• All text and images for all sections edited and proofed
4/27/09 (MON) FINAL EXHIBIT DESIGN SUBMITTAL
• Final exhibit graphics submitted for sign-off
• Exhibit graphics go to print by 4/29/09
4/20-5/8/09 (3 WEEKS) SET BUILDING
4/30-5/3/09 (WEEKEND) AAM CONFERENCE (Erin and Ron attending)
5/9/09 (SAT) EXHIBIT OPENING
Exhibit Name
Add your suggestion for the full name for the exhibit here!