The PayBack method - An example


The payback method does not include the value of time, it is strictly calculating the time it takes to cover the investment. Present and Future value methods add value to time in terms of discounting. The attached spreadsheet (FinancialMetricsLite.xls) gives a introduction to several project evaluation methods.