Steelwork Begins
Posted 12/4/08
I apologize for being behind in the updates - so here's two slideshows to catch us up. Massive changes have occurred; parts of the steel skeleton of the building are in place, and are now visible from the entire campus!
UPDATE:The pictures are coming in faster than I can post them - the pace of the work is amazing! These were taken the afternoon of 12/4/08:
Water and Sewer Lines Installed
Posted 12/16/08
The changes aren't as dramatic this time as seeing the steel go up, but even the seemingly little ones are exciting! The water and sewer lines have been installed, and the upper level floors are taking shape as steel decking is laid in place. Thanks again to Jimmy, the Triangle foreman, for the pictures.
Long Time, No Updates!
Posted 1/22/09
Sorry to have not posted for so long - to make up for it, here's 3 slideshows of the latest updates:
Rough Plumbing
Taken 12/24/08
The rough plumbing for the lower floor is being placed, and some of the upper floor steel decking is installed.
Steelwork Progress 1
Taken 1/10/09
The building continues to grow as more steel is put into place.
Steelwork Progress 2
Taken 1/22/09
Details are beginning to emerge on the building, such as the cafeteria window structure and one of the roof cupolas.
Interior Framing Begins
Posted 2/2/09
The first truckload of light-gauge steel arrives, and work begins on the interior walls. The steel for the gym has been put in place as well.
Interior Framing Continues
Posted 2/10/09
The exterior framing on the second floor continues, while the first
floor is readied to be poured. Internal elements such as ventilation
ducts are being placed.
Interior Walls Placed
Posted 2/17/09
The
upstairs interior walls have been framed with light gauge steel, the
first floor concrete has been poured, and part of the roof has been
installed.
Interior Work Progress
Posted 2/25/09
The
interior elements of the new building are coming along quickly, with
more framing, external paneling being placed, and further concrete work.
SPECIAL - Sneak Peak!
Posted 2/26/09
We got to
take a sneak peek at the new facility - the progress is amazing, and
the scale of every room and common area is overwhelming!
Snow Day!
Posted 3/19/09
Even unfinished, our new building looks nice in the snow. Hopefully this will be the last time we see snow inside the building!
Drywall Begins
Posted 4/1/09
Insulation and drywall has been placed in the building's interior, with
the hallways and rooms taking shape. Exterior elements like the window
framing have been added as well.
BMC Staff Visit New Building
Posted 4/21/09
The BMC Staff got to tour the new building, seeing the construction progress, and finding their new rooms.
Brickwork and Interior Progress
Posted 4/21/09
The brick has started to rise on the exterior of the building as the interior spaces are being finished...
Parking Lot Poured
Posted 7/14/09
The parking lot for the new building is being poured and paved. This is
a good news to all since the rain has kept this element from being
completed!
Latest Exterior Pictures
Posted 7/14/09
The exterior of the building is almost complete, with minor details
being finished. The parking lot has already had lines painted, and even
some landscaping has begun.